Home / Custom Process
Kingston Custom Staircase Process

FROM ARCHITECTURE
TO BUILT STAIRCASE

Kingston supports custom staircase projects from early architectural information through geometry development, engineering coordination, fabrication and project delivery. The process is developed around the building rather than a standard stair system.

Architecture Geometry Engineering Fabrication
Custom steel staircase project coordination and site review 01
Kingston / Project Coordination Architecture · Geometry · Structure · Site
01 Project Information Architectural drawings, dimensions and design references establish the starting point.
02 Geometry Development Stair form, radius, rotation, landings and circulation are developed around the space.
03 Engineering Coordination Structure, connections, interfaces and material build-ups are coordinated.
04 Fabrication & Delivery Approved geometry moves into fabrication, checking, packing and project delivery.
KINGSTON / CUSTOM STAIRCASE PROCESS DESIGN DEVELOPMENT · ENGINEERING · FABRICATION · PROJECT SUPPORT
Step 01 / Project Information

START WITH
WHAT YOU HAVE

A custom staircase project does not need to begin with a complete construction package. Early plans, dimensions and design references are often enough for Kingston to review the architectural conditions and establish an initial staircase direction.

Initial Project Review

The first conversation begins with the architecture.

We first review how the staircase needs to relate to the building: the floor-to-floor height, opening, available footprint, landing conditions and intended architectural character. This information helps define what type of geometry is technically and visually appropriate for the project.

Important

Complete construction drawings are not required to begin an initial project discussion.

Architectural review and site coordination for a custom steel staircase project 02
Kingston / Initial Review Architecture · Dimensions · Project Conditions
01 Architectural Drawings Plans, sections, floor layouts or early architectural drawings showing the stair area.
02 Floor Height Floor-to-floor height and the vertical relationship between connected levels.
03 Stair Opening Opening dimensions, available footprint, landing edges and preferred circulation path.
04 Design References Images showing preferred stair form, materials, railing and architectural character.
05 Project Location Country, city and basic project information for delivery and project coordination.

If some information is still developing, Kingston can identify the additional dimensions or architectural conditions required before the staircase geometry moves into the next stage.

SEND YOUR PROJECT INFORMATION →
Step 02 / Geometry Development

SHAPE THE STAIR
AROUND THE SPACE

Once the architectural conditions are understood, the staircase geometry begins to take shape. Radius, rotation, width, landings and circulation are developed together so the stair responds to both the space and the intended architectural expression.

Custom curved steel staircase geometry coordinated with floor opening and structural conditions 03
Kingston / Geometry Development Radius · Rotation · Opening · Landing
Developing The Stair Form

Geometry is developed as part of the architecture.

The objective is not simply to fit a staircase into an opening. The stair needs to move correctly through the space, arrive at the right landing conditions, maintain comfortable circulation and preserve the intended architectural proportion.

01
Radius & Curve The curvature is developed around the available footprint and architectural intent.
02
Rotation Total rotation and direction are coordinated with entry points, landings and circulation.
03
Stair Width Clear width is balanced with scale, comfort and the available architectural space.
04
Opening & Landing Floor openings, landing edges and arrival positions are coordinated with the stair path.
05
Headroom Vertical clearance is reviewed throughout the stair to maintain usable circulation.
06
Circulation Entry, movement and arrival are considered together rather than as isolated dimensions.
01 Architectural Fit The stair geometry is developed in response to the surrounding architecture, not treated as an isolated object.
02 Comfortable Movement Step distribution, width, headroom and circulation are reviewed together as the form develops.
03 Buildable Geometry The developed form must also provide a practical basis for structural design, fabrication and installation.

At this stage the staircase begins to move from an architectural intention toward a defined system. Once the geometry is established, structural connections, interfaces and material build-ups can be coordinated in greater detail.

EXPLORE DESIGN & ENGINEERING →
Step 03 / Design & Engineering Coordination

CONNECT THE STAIR
TO THE BUILDING

Once the staircase geometry is established, the next stage is to resolve how the stair actually meets the building. Structure, floor interfaces, landings, tread build-ups, railings and finish conditions are coordinated before fabrication begins.

Structural connection and installation detail of a custom curved steel staircase 04
Kingston / Engineering Coordination Structure · Floor Edge · Landing · Interface
Resolving The Interfaces

The detail matters where the staircase meets architecture.

A staircase can have the correct overall geometry and still create problems if its connection points and finish interfaces are not resolved early. Kingston develops the stair together with the surrounding building conditions so critical junctions are understood before fabrication.

01
Floor & Landing Connections Stair ends, floor edges and landing conditions are coordinated so structural interfaces align with the building.
02
Steel Plate Termination Side plates and structural members are developed to terminate accurately at floors, landings, walls and architectural finishes.
03
Tread & Finish Build-Up Steel support levels are coordinated with the thickness of timber, stone or other tread finishes to achieve the intended final level.
04
Railing & Glass Interfaces Glass channels, railing supports and fixing conditions are coordinated with the staircase structure rather than added afterward.
01 Stair Geometry Drawings Overall form, elevations, plan relationships, radii, rotation and key dimensions are defined.
02 Connection Details Critical floor, landing, wall and structural interfaces are developed for coordination.
03 Material Interfaces Treads, finishes, balustrades and lighting conditions are coordinated with the steel structure.
04 Fabrication Information Approved geometry and interface information provide the basis for fabrication and workshop preparation.

The objective of this stage is to remove uncertainty before steel fabrication begins. Stair geometry, structural interfaces, finish levels and adjoining architectural conditions should work together as one coordinated system.

EXPLORE DESIGN & ENGINEERING →
Step 04 / Material & Finish Confirmation

COMPLETE THE FORM
WITH MATERIAL

Once geometry and structural interfaces are defined, material direction can be confirmed in greater detail. Steel finishes, tread materials, balustrades and lighting are coordinated with the staircase structure and the surrounding architectural palette.

01 Material Direction Steel finish, tread material, railing type and key visible surfaces are established.
02 Samples & References Finish references or available samples can be reviewed against the intended architectural palette.
03 Interface Review Material thicknesses, fixing conditions and transitions are checked against the steel structure.
04 Final Confirmation Approved material information is incorporated into the final fabrication and detailing direction.

Material decisions are coordinated with geometry and structure rather than treated as decoration at the end of the project. This helps reduce conflicts between the steelwork, tread build-up, balustrade and architectural finishes.

EXPLORE MATERIALS & FINISHES →
Step 05 / Fabrication & Pre-Assembly

THE GEOMETRY
BECOMES STEEL

Once geometry, structural interfaces and material requirements are confirmed, the staircase moves into fabrication. Curved steel components are formed, assembled and checked at full scale so the developed geometry can be translated accurately into the physical structure.

Structural assembly and geometry review of a custom helical steel staircase 04
Pre-Assembly & Geometry Review

Reviewed Before Packing & Delivery

Key dimensions, geometry and interfaces are reviewed before the staircase moves into final preparation, packing and project delivery.

01 Curved Steel Forming Steel plate and structural sections are shaped around the approved radius and developed geometry.
02 Welding & Assembly Components are positioned, fitted and assembled into the primary staircase structure.
03 Geometry Verification Critical dimensions, curve relationships, landings and structural interfaces are reviewed.
04 Pre-Assembly Review Where project conditions require it, sections can be assembled and checked before final preparation.
Before Delivery

Check The Structure Before It Reaches Site.

The objective is to identify dimensional or interface issues while the staircase is still in a controlled fabrication environment. Geometry, key connection locations and overall assembly conditions can therefore be reviewed before packing and shipment.

Fabrication is not separated from the earlier design process. The geometry, structural interfaces and material decisions developed in previous stages provide the basis for how the staircase is formed, assembled and checked in the workshop.

NEXT · DELIVERY & SITE COORDINATION →
Step 06 / Delivery & Site Coordination

FROM WORKSHOP
TO PROJECT SITE

Large custom staircases must be considered not only as finished structures, but as systems that need to move from fabrication to the building site. Sectioning, identification, packing, delivery information and installation interfaces are planned around the requirements of each project.

Bespoke steel staircase structural assembly and coordination on site 07
Kingston / Site Coordination Sections · Connections · Installation · Interfaces
Planning Beyond Fabrication

A large staircase must also be designed to travel and install.

Overall geometry may be continuous, but transportation and site conditions often require the steel structure to be divided into carefully planned sections. Connection locations, installation sequence and architectural interfaces therefore need to be considered before the staircase leaves the workshop.

01
Modular Planning Large staircase structures can be divided into project-specific sections according to transport, access and installation conditions.
02
Packing & Identification Structural sections and related components are identified so their relationship can be understood during unpacking and installation.
03
Installation Information Key assembly relationships, connection positions and installation interfaces can be documented for site coordination.
04
Site Coordination Floor edges, landing conditions, support points and adjoining construction are reviewed against the staircase installation requirements.
01 Section Planning Structural divisions are coordinated with transport dimensions, access conditions and final installation requirements.
02 Protection & Packing Stair sections and related components are prepared for transport according to their size, finish and project conditions.
03 Project Delivery Delivery requirements are considered together with project location, site access and installation sequence.
04 Installation Support Project information and coordination support help the installation team understand critical stair and building interfaces.
At The Building

Installation Is Part Of The Design Process.

The staircase does not end at the workshop door. Final alignment depends on the actual building conditions: floor levels, openings, landing edges, wall finishes, structural supports and the sequence of surrounding construction. These relationships should remain coordinated through the installation stage.

For international projects, the exact delivery and installation-support scope can be defined according to project location, staircase size, site access and the responsibilities of the local contractor or installation team.

DISCUSS YOUR PROJECT →
Begin Your Custom Staircase Project

START WITH
YOUR DRAWINGS

Send us the architectural information you already have. Kingston can review the staircase geometry, structural conditions, material direction and project requirements, then identify the next information needed to move the design forward.

Initial Project Review

A complete construction package is not required.

Architectural plans, floor heights, stair opening dimensions and reference images are usually enough to begin the first project discussion.

01 Architectural Plans Floor plans, sections or early drawings showing the staircase area.
02 Key Dimensions Floor height, stair opening, available footprint and landing conditions.
03 Design References Preferred stair geometry, materials, railing and architectural references.
04 Project Information Project type, location and relevant delivery or site coordination information.
KINGSTON / CUSTOM STAIRCASE PROCESS ARCHITECTURE · ENGINEERING · FABRICATION · PROJECT SUPPORT